Back to jobs

Cyclic Fix Verification

InstallHanded Over

J-2050 · Meridian Offices · Meridian House

Lifecycle
TypeInstall· locked once scheduled
  1. Created
  2. Scheduled
  3. In Progress
  4. Commissioning
  5. Complete
  6. Handed Over
Getting to site
Get directions
Meridian House
45 King St, Bristol
BS1 4EF
How to get in
Security escort required
Access hours
Mon–Fri, 8:00am–5:00pm
Parking
On-site visitor parking
Site contact
Mark Reilly
Call site contact
Cyclic Fix Verification — L2 fire alarm design
Design D-350 · 100% complete
Compliant
Device schedule
23 devices
DeviceQty
Optical Smoke12
Multi-sensor3
Manual Call Point2
Sounder + VAD4
I/O Interface2
Commissioning checklist
BS 5839-1 Cl. 41 · 0/10 checked
System checks
  • Control panel: mains and standby supply verified
  • Cause & effect matrix verified against design
  • All zones correctly mapped and annunciated
  • Sounder sound pressure level ≥ 65 dB(A) throughout
  • Fault and disablement indication tested
Device checks
  • Optical Smoke — function test (×12)
  • Multi-sensor — function test (×3)
  • Manual Call Point — function test (×2)
  • Sounder + VAD — function test (×4)
  • I/O Interface — function test (×2)

James Taylor is not recorded as a competent person, so cannot sign off commissioning. A competent person must sign it.

Defects (0 open)
BS 5839-1 Cl. 44.2 · severity drives the remediation window

No defects raised on this job.

Raise a defect

As-built variations (0)
On-site deviations from the design · JOB-7

No variations — installed as designed.

Material list

No material list (job has no linked quote).

Materials & stock
0 allocation(s)

No stock allocated to this job yet.

Labour & profitability
From approved timesheets
Quoted value
—
Approved labour
£0
Margin (ex-materials)
—
Competent-person attendance

No time logged against this job yet.

Site information
Property
Meridian House
Address
45 King St, Bristol
Postcode
BS1 4EF
Building type
Office
Floors
8
System category
BS 5839-6 L2
Floor plans
  • Ground floor· PDF · 22 May
  • First floor· IMAGE · 16 May
View property →
Engineers & dates
AM
Alex MorganLeadPrimary
Completion
Handed over
Completed 28 May · signed off by Alex Morgan
Generate handover Compliance pack
Acceptance certificate
BS 5839-1 Cl. 40.3 / Annex G.4 — required before handover.

Not yet generated.

No Acceptance Certificate has been generated for this job.

Lifecycle audit
  • Reconstructed from this job's current stage — recorded transitions start from the next change.
  • CompleteHanded Over
    20 May · Alex Morgan
  • CommissioningComplete
    19 May · Alex Morgan
  • In ProgressCommissioning
    18 May · Alex Morgan
  • ScheduledIn Progress
    17 May · Alex Morgan
  • CreatedScheduled
    16 May · Alex Morgan
  • —Created
    15 May · Alex Morgan
Notes
  • Initial site survey completed; access arranged with facilities.
    1 Jun · Alex Morgan
Issues & holds

No issues or holds.