Greenway pharmacy

RemediationIn Progress On hold

J-2018 · Greenway NHS Trust · Greenway Pharmacy

Lifecycle
TypeRemediation· locked once scheduled
  1. Created
  2. Scheduled
  3. In Progress
  4. Commissioning
  5. Complete
  6. Handed Over
Getting to site
Get directions
Greenway Pharmacy
Greenway Rd, Cardiff
CF14 4XX
How to get in
Security escort required
Access hours
24/7 — coordinate with the duty manager
Parking
On-site visitor parking
Site contact
Mark Reilly
Call site contact

No design package linked.

Device schedule
0 devices

No device schedule available.

Commissioning checklist
BS 5839-1 Cl. 41 · 0/5 checked
System checks
  • Control panel: mains and standby supply verified
  • Cause & effect matrix verified against design
  • All zones correctly mapped and annunciated
  • Sounder sound pressure level ≥ 65 dB(A) throughout
  • Fault and disablement indication tested

James Taylor is not recorded as a competent person, so cannot sign off commissioning. A competent person must sign it.

Defects (0 open)
BS 5839-1 Cl. 44.2 · severity drives the remediation window

No defects raised on this job.

Raise a defect

As-built variations (0)
On-site deviations from the design · JOB-7

No variations — installed as designed.

Material list

No material list (job has no linked quote).

Materials & stock
0 allocation(s)

No stock allocated to this job yet.

Labour & profitability
From approved timesheets
Quoted value
—
Approved labour
£0
Margin (ex-materials)
—
Competent-person attendance

No time logged against this job yet.

Site information
Property
Greenway Pharmacy
Address
Greenway Rd, Cardiff
Postcode
CF14 4XX
Building type
Healthcare
Floors
1
System category
BS 5839-6 L1
Floor plans
  • Ground floor· PDF · 22 May
View property →
Engineers & dates
CN
Chris NolanLeadPrimary
Completion

Mark the job complete to trigger handover documentation.

Acceptance certificate
BS 5839-1 Cl. 40.3 / Annex G.4 — required before handover.

Not yet generated.

Available once the job is Complete.

Lifecycle audit
  • Reconstructed from this job's current stage — recorded transitions start from the next change.
  • ScheduledIn Progress
    21 May · Chris Nolan
  • CreatedScheduled
    20 May · Chris Nolan
  • —Created
    19 May · Chris Nolan
Notes
  • Zone plan reviewed against the device schedule.
    1 Jun · Chris Nolan
  • Commissioning checks scheduled with the duty manager.
    29 May · Chris Nolan
Issues & holds
  • Parts on backorder
    Hold · 1 Jun