Back to jobs

Stoneworks weighbridge

InstallCommissioning

J-2016 · Stoneworks Manufacturing · Stoneworks Factory

Lifecycle
TypeInstall· locked once scheduled
  1. Created
  2. Scheduled
  3. In Progress
  4. Commissioning
  5. Complete
  6. Handed Over
Getting to site
Get directions
Stoneworks Factory
Foundry Lane, Derby
DE1 3RT
How to get in
Contractor pass
Access hours
Mon–Fri, 8:00am–5:00pm
Parking
Street parking — pay & display nearby
Site contact
Priya Patel
Call site contact

No design package linked.

Device schedule
0 devices

No device schedule available.

Commissioning checklist
BS 5839-1 Cl. 41 · 0/5 checked
System checks
  • Control panel: mains and standby supply verified
  • Cause & effect matrix verified against design
  • All zones correctly mapped and annunciated
  • Sounder sound pressure level ≥ 65 dB(A) throughout
  • Fault and disablement indication tested

James Taylor is not recorded as a competent person, so cannot sign off commissioning. A competent person must sign it.

Defects (0 open)
BS 5839-1 Cl. 44.2 · severity drives the remediation window

No defects raised on this job.

Raise a defect

As-built variations (0)
On-site deviations from the design · JOB-7

No variations — installed as designed.

Material list

No material list (job has no linked quote).

Materials & stock
0 allocation(s)

No stock allocated to this job yet.

Labour & profitability
From approved timesheets
Quoted value
—
Approved labour
£0
Margin (ex-materials)
—
Competent-person attendance

No time logged against this job yet.

Site information
Property
Stoneworks Factory
Address
Foundry Lane, Derby
Postcode
DE1 3RT
Building type
Industrial
Floors
2
System category
BS 5839-6 P1
Floor plans
  • Ground floor· PDF · 22 May
  • First floor· IMAGE · 16 May
View property →
Engineers & dates
AM
Alex MorganLeadPrimary
Completion

Mark the job complete to trigger handover documentation.

Acceptance certificate
BS 5839-1 Cl. 40.3 / Annex G.4 — required before handover.

Not yet generated.

Available once the job is Complete.

Lifecycle audit
  • Reconstructed from this job's current stage — recorded transitions start from the next change.
  • In ProgressCommissioning
    24 May · Alex Morgan
  • ScheduledIn Progress
    23 May · Alex Morgan
  • CreatedScheduled
    22 May · Alex Morgan
  • —Created
    21 May · Alex Morgan
Notes
  • Control panel positioned; awaiting final containment.
    1 Jun · Alex Morgan
  • Client walkthrough booked for end of week.
    29 May · Alex Morgan
  • Zone plan reviewed against the device schedule.
    26 May · Alex Morgan
Issues & holds

No issues or holds.