Academy science wing
InstallScheduledJ-2015 · Riverside Academy Trust · Riverside Science Wing
Lifecycle
TypeInstall· locked once scheduled
- Created
- Scheduled
- In Progress
- Commissioning
- Complete
- Handed Over
Getting to site
Get directionsRiverside Science Wing
Riverside Ave, Nottingham
NG2 4LQ
How to get in
Reception sign-in
Access hours
Mon–Fri, 8:00am–5:00pm
Parking
On-site visitor parking
Design package
Academy science wing
Design D-309 · 50% complete
Device schedule
30 devices| Device | Qty |
|---|---|
| Optical Smoke | 17 |
| Heat Detector | 3 |
| Manual Call Point | 3 |
| Sounder + VAD | 5 |
| I/O Interface | 2 |
Commissioning checklist
BS 5839-1 Cl. 41 · 0/10 checkedSystem checks
- Control panel: mains and standby supply verified
- Cause & effect matrix verified against design
- All zones correctly mapped and annunciated
- Sounder sound pressure level ≥ 65 dB(A) throughout
- Fault and disablement indication tested
Device checks
- Optical Smoke — function test (×17)
- Heat Detector — function test (×3)
- Manual Call Point — function test (×3)
- Sounder + VAD — function test (×5)
- I/O Interface — function test (×2)
James Taylor is not recorded as a competent person, so cannot sign off commissioning. A competent person must sign it.
Defects (0 open)
BS 5839-1 Cl. 44.2 · severity drives the remediation windowNo defects raised on this job.
Raise a defect
As-built variations (0)
On-site deviations from the design · JOB-7No variations — installed as designed.
Material list
No material list (job has no linked quote).
Materials & stock
0 allocation(s)No stock allocated to this job yet.
Labour & profitability
From approved timesheets- Quoted value
- —
- Approved labour
- £0
- Margin (ex-materials)
- —
Competent-person attendance
No time logged against this job yet.
Site information
- Property
- Riverside Science Wing
- Address
- Riverside Ave, Nottingham
- Postcode
- NG2 4LQ
- Building type
- Education
- Floors
- 2
- System category
- BS 5839-6 L1
Floor plans
- Ground floor· PDF · 22 May
Engineers & dates
DR
Dana ReedLeadPrimary
ES
Evan ShawInstall
Completion
Mark the job complete to trigger handover documentation.
Acceptance certificate
BS 5839-1 Cl. 40.3 / Annex G.4 — required before handover.Not yet generated.
Available once the job is Complete.
Lifecycle audit
- Reconstructed from this job's current stage — recorded transitions start from the next change.
- CreatedScheduled23 May · Dana Reed
- —Created22 May · Dana Reed
Notes
- First-fix cabling underway on the ground floor.1 Jun · Dana Reed
- Control panel positioned; awaiting final containment.29 May · Dana Reed
Issues & holds
No issues or holds.