Back to jobs

Academy science wing

InstallScheduled

J-2015 · Riverside Academy Trust · Riverside Science Wing

Lifecycle
TypeInstall· locked once scheduled
  1. Created
  2. Scheduled
  3. In Progress
  4. Commissioning
  5. Complete
  6. Handed Over
Getting to site
Get directions
Riverside Science Wing
Riverside Ave, Nottingham
NG2 4LQ
How to get in
Reception sign-in
Access hours
Mon–Fri, 8:00am–5:00pm
Parking
On-site visitor parking
Site contact
Mark Reilly
Call site contact
Academy science wing
Design D-309 · 50% complete
Compliant
Device schedule
30 devices
DeviceQty
Optical Smoke17
Heat Detector3
Manual Call Point3
Sounder + VAD5
I/O Interface2
Commissioning checklist
BS 5839-1 Cl. 41 · 0/10 checked
System checks
  • Control panel: mains and standby supply verified
  • Cause & effect matrix verified against design
  • All zones correctly mapped and annunciated
  • Sounder sound pressure level ≥ 65 dB(A) throughout
  • Fault and disablement indication tested
Device checks
  • Optical Smoke — function test (×17)
  • Heat Detector — function test (×3)
  • Manual Call Point — function test (×3)
  • Sounder + VAD — function test (×5)
  • I/O Interface — function test (×2)

James Taylor is not recorded as a competent person, so cannot sign off commissioning. A competent person must sign it.

Defects (0 open)
BS 5839-1 Cl. 44.2 · severity drives the remediation window

No defects raised on this job.

Raise a defect

As-built variations (0)
On-site deviations from the design · JOB-7

No variations — installed as designed.

Material list

No material list (job has no linked quote).

Materials & stock
0 allocation(s)

No stock allocated to this job yet.

Labour & profitability
From approved timesheets
Quoted value
—
Approved labour
£0
Margin (ex-materials)
—
Competent-person attendance

No time logged against this job yet.

Site information
Property
Riverside Science Wing
Address
Riverside Ave, Nottingham
Postcode
NG2 4LQ
Building type
Education
Floors
2
System category
BS 5839-6 L1
Floor plans
  • Ground floor· PDF · 22 May
View property →
Engineers & dates
DR
Dana ReedLeadPrimary
ES
Evan ShawInstall
Completion

Mark the job complete to trigger handover documentation.

Acceptance certificate
BS 5839-1 Cl. 40.3 / Annex G.4 — required before handover.

Not yet generated.

Available once the job is Complete.

Lifecycle audit
  • Reconstructed from this job's current stage — recorded transitions start from the next change.
  • CreatedScheduled
    23 May · Dana Reed
  • —Created
    22 May · Dana Reed
Notes
  • First-fix cabling underway on the ground floor.
    1 Jun · Dana Reed
  • Control panel positioned; awaiting final containment.
    29 May · Dana Reed
Issues & holds

No issues or holds.