Apex yard gatehouse

Service-calloutComplete

J-2014 · Apex Logistics · Apex Yard Gatehouse

Lifecycle
TypeService-callout· locked once scheduled
  1. Created
  2. Scheduled
  3. In Progress
  4. Commissioning
  5. Complete
  6. Handed Over
Getting to site
Get directions
Apex Yard Gatehouse
Quarry Park, Sheffield
S9 1XK
How to get in
Security escort required
Access hours
Mon–Fri, 8:00am–5:00pm
Parking
On-site visitor parking
Site contact
Mark Reilly
Call site contact

No design package linked.

Device schedule
0 devices

No device schedule available.

Commissioning checklist
BS 5839-1 Cl. 41 · 0/5 checked
System checks
  • Control panel: mains and standby supply verified
  • Cause & effect matrix verified against design
  • All zones correctly mapped and annunciated
  • Sounder sound pressure level ≥ 65 dB(A) throughout
  • Fault and disablement indication tested

James Taylor is not recorded as a competent person, so cannot sign off commissioning. A competent person must sign it.

Defects (0 open)
BS 5839-1 Cl. 44.2 · severity drives the remediation window

No defects raised on this job.

Raise a defect

As-built variations (0)
On-site deviations from the design · JOB-7

No variations — installed as designed.

Material list

No material list (job has no linked quote).

Materials & stock
0 allocation(s)

No stock allocated to this job yet.

Labour & profitability
From approved timesheets
Quoted value
—
Approved labour
£0
Margin (ex-materials)
—
Competent-person attendance

No time logged against this job yet.

Site information
Property
Apex Yard Gatehouse
Address
Quarry Park, Sheffield
Postcode
S9 1XK
Building type
Office
Floors
1
System category
BS 5839-6 L2
View property →
Engineers & dates
DR
Dana ReedLeadPrimary
Completion
Completed
Completed 5 Jun · signed off by Dana Reed
Generate handover
Acceptance certificate
BS 5839-1 Cl. 40.3 / Annex G.4 — required before handover.

Not yet generated.

This job has no linked design, so there is nothing to certify.

No Acceptance Certificate has been generated for this job.

Lifecycle audit
  • Reconstructed from this job's current stage — recorded transitions start from the next change.
  • CommissioningComplete
    27 May · Dana Reed
  • In ProgressCommissioning
    26 May · Dana Reed
  • ScheduledIn Progress
    25 May · Dana Reed
  • CreatedScheduled
    24 May · Dana Reed
  • —Created
    23 May · Dana Reed
Notes
  • Initial site survey completed; access arranged with facilities.
    1 Jun · Dana Reed
Issues & holds

No issues or holds.