Care home — laundry block

Service-scheduledIn Progress

J-2013 · Brookfield Care Homes · Brookfield Laundry Block

Lifecycle
TypeService-scheduled· locked once scheduled
  1. Created
  2. Scheduled
  3. In Progress
  4. Commissioning
  5. Complete
  6. Handed Over
Getting to site
Get directions
Brookfield Laundry Block
12 Elm Rise, York
YO31 8TW
How to get in
Contractor pass
Access hours
Mon–Fri, 8:00am–5:00pm
Parking
On-site visitor parking
Site contact
Tom Fisher
Call site contact

No design package linked.

Device schedule
0 devices

No device schedule available.

Commissioning checklist
BS 5839-1 Cl. 41 · 0/5 checked
System checks
  • Control panel: mains and standby supply verified
  • Cause & effect matrix verified against design
  • All zones correctly mapped and annunciated
  • Sounder sound pressure level ≥ 65 dB(A) throughout
  • Fault and disablement indication tested

James Taylor is not recorded as a competent person, so cannot sign off commissioning. A competent person must sign it.

Defects (0 open)
BS 5839-1 Cl. 44.2 · severity drives the remediation window

No defects raised on this job.

Raise a defect

As-built variations (0)
On-site deviations from the design · JOB-7

No variations — installed as designed.

Material list

No material list (job has no linked quote).

Materials & stock
0 allocation(s)

No stock allocated to this job yet.

Labour & profitability
From approved timesheets
Quoted value
—
Approved labour
£0
Margin (ex-materials)
—
Competent-person attendance

No time logged against this job yet.

Site information
Property
Brookfield Laundry Block
Address
12 Elm Rise, York
Postcode
YO31 8TW
Building type
Industrial
Floors
1
System category
BS 5839-6 P1
View property →
Engineers & dates
CN
Chris NolanLeadPrimary
CN
Chris NolanLead
Completion

Mark the job complete to trigger handover documentation.

Acceptance certificate
BS 5839-1 Cl. 40.3 / Annex G.4 — required before handover.

Not yet generated.

Available once the job is Complete.

Lifecycle audit
  • Reconstructed from this job's current stage — recorded transitions start from the next change.
  • ScheduledIn Progress
    26 May · Chris Nolan
  • CreatedScheduled
    25 May · Chris Nolan
  • —Created
    24 May · Chris Nolan
Notes
  • Commissioning checks scheduled with the duty manager.
    1 Jun · Chris Nolan
  • Initial site survey completed; access arranged with facilities.
    29 May · Chris Nolan
  • First-fix cabling underway on the ground floor.
    26 May · Chris Nolan
Issues & holds

No issues or holds.