Crestline tower core

InstallCreated

J-2012 · Crestline Properties · Crestline Tower

Lifecycle
Type
  1. Created
  2. Scheduled
  3. In Progress
  4. Commissioning
  5. Complete
  6. Handed Over
Getting to site
Get directions
Crestline Tower
1 Crest Plaza, London
E14 9GD
How to get in
Key holder on site
Access hours
Mon–Fri, 8:00am–5:00pm
Parking
On-site visitor parking
Site contact
Tom Fisher
Call site contact
Crestline tower core
Design D-308 · 20% complete
1 violations
Device schedule
13 devices
DeviceQty
Aspirating (ASD)1
Optical Smoke6
Manual Call Point2
Sounder4
Commissioning checklist
BS 5839-1 Cl. 41 · 0/9 checked
System checks
  • Control panel: mains and standby supply verified
  • Cause & effect matrix verified against design
  • All zones correctly mapped and annunciated
  • Sounder sound pressure level ≥ 65 dB(A) throughout
  • Fault and disablement indication tested
Device checks
  • Aspirating (ASD) — function test (×1)
  • Optical Smoke — function test (×6)
  • Manual Call Point — function test (×2)
  • Sounder — function test (×4)

James Taylor is not recorded as a competent person, so cannot sign off commissioning. A competent person must sign it.

Defects (0 open)
BS 5839-1 Cl. 44.2 · severity drives the remediation window

No defects raised on this job.

Raise a defect

As-built variations (0)
On-site deviations from the design · JOB-7

No variations — installed as designed.

Material list

No material list (job has no linked quote).

Materials & stock
0 allocation(s)

No stock allocated to this job yet.

Labour & profitability
From approved timesheets
Quoted value
—
Approved labour
£0
Margin (ex-materials)
—
Competent-person attendance

No time logged against this job yet.

Site information
Property
Crestline Tower
Address
1 Crest Plaza, London
Postcode
E14 9GD
Building type
Office
Floors
12
System category
BS 5839-6 L1
Floor plans
  • Ground floor· PDF · 22 May
  • First floor· IMAGE · 16 May
  • Second floor· PDF · 10 May
View property →
Engineers & dates
BC
Beth CarterLeadPrimary
Completion

Mark the job complete to trigger handover documentation.

Acceptance certificate
BS 5839-1 Cl. 40.3 / Annex G.4 — required before handover.

Not yet generated.

Available once the job is Complete.

Lifecycle audit
  • Reconstructed from this job's current stage — recorded transitions start from the next change.
  • —Created
    25 May · Beth Carter
Notes
  • Zone plan reviewed against the device schedule.
    1 Jun · Beth Carter
  • Commissioning checks scheduled with the duty manager.
    29 May · Beth Carter
Issues & holds

No issues or holds.