Back to jobs

Pinnacle gym zone

InstallScheduled On hold

J-2011 · Pinnacle Leisure · Pinnacle Leisure Centre

Lifecycle
TypeInstall· locked once scheduled
  1. Created
  2. Scheduled
  3. In Progress
  4. Commissioning
  5. Complete
  6. Handed Over
Getting to site
Get directions
Pinnacle Leisure Centre
Riverside Quay, Newcastle
NE1 3DX
How to get in
Key safe
Access hours
24/7 — coordinate with the duty manager
Parking
On-site visitor parking
Site contact
James Bloggs
Call site contact

No design package linked.

Device schedule
0 devices

No device schedule available.

Commissioning checklist
BS 5839-1 Cl. 41 · 0/5 checked
System checks
  • Control panel: mains and standby supply verified
  • Cause & effect matrix verified against design
  • All zones correctly mapped and annunciated
  • Sounder sound pressure level ≥ 65 dB(A) throughout
  • Fault and disablement indication tested

James Taylor is not recorded as a competent person, so cannot sign off commissioning. A competent person must sign it.

Defects (0 open)
BS 5839-1 Cl. 44.2 · severity drives the remediation window

No defects raised on this job.

Raise a defect

As-built variations (0)
On-site deviations from the design · JOB-7

No variations — installed as designed.

Material list

No material list (job has no linked quote).

Materials & stock
0 allocation(s)

No stock allocated to this job yet.

Labour & profitability
From approved timesheets
Quoted value
—
Approved labour
£0
Margin (ex-materials)
—
Competent-person attendance

No time logged against this job yet.

Site information
Property
Pinnacle Leisure Centre
Address
Riverside Quay, Newcastle
Postcode
NE1 3DX
Building type
Hospitality
Floors
2
System category
BS 5839-6 L2
Floor plans
  • Ground floor· PDF · 22 May
  • First floor· IMAGE · 16 May
View property →
Engineers & dates
ES
Evan ShawLeadPrimary
Completion

Mark the job complete to trigger handover documentation.

Acceptance certificate
BS 5839-1 Cl. 40.3 / Annex G.4 — required before handover.

Not yet generated.

Available once the job is Complete.

Lifecycle audit
  • Reconstructed from this job's current stage — recorded transitions start from the next change.
  • CreatedScheduled
    27 May · Evan Shaw
  • —Created
    26 May · Evan Shaw
Notes
  • Client walkthrough booked for end of week.
    1 Jun · Evan Shaw
Issues & holds
  • Survey rescheduled by client
    Hold · 1 Jun