Meridian floor 3

InstallCommissioning

J-2010 · Meridian Offices · Meridian House

Lifecycle
TypeInstall· locked once scheduled
  1. Created
  2. Scheduled
  3. In Progress
  4. Commissioning
  5. Complete
  6. Handed Over
Getting to site
Get directions
Meridian House
45 King St, Bristol
BS1 4EF
How to get in
Security escort required
Access hours
Mon–Fri, 8:00am–5:00pm
Parking
On-site visitor parking
Site contact
Mark Reilly
Call site contact

No design package linked.

Device schedule
0 devices

No device schedule available.

Commissioning checklist
BS 5839-1 Cl. 41 · 0/5 checked
System checks
  • Control panel: mains and standby supply verified
  • Cause & effect matrix verified against design
  • All zones correctly mapped and annunciated
  • Sounder sound pressure level ≥ 65 dB(A) throughout
  • Fault and disablement indication tested

James Taylor is not recorded as a competent person, so cannot sign off commissioning. A competent person must sign it.

Defects (0 open)
BS 5839-1 Cl. 44.2 · severity drives the remediation window

No defects raised on this job.

Raise a defect

As-built variations (0)
On-site deviations from the design · JOB-7

No variations — installed as designed.

Material list

No material list (job has no linked quote).

Materials & stock
0 allocation(s)

No stock allocated to this job yet.

Labour & profitability
From approved timesheets
Quoted value
—
Approved labour
£0
Margin (ex-materials)
—
Competent-person attendance

No time logged against this job yet.

Site information
Property
Meridian House
Address
45 King St, Bristol
Postcode
BS1 4EF
Building type
Office
Floors
8
System category
BS 5839-6 L2
Floor plans
  • Ground floor· PDF · 22 May
  • First floor· IMAGE · 16 May
View property →
Engineers & dates
ES
Evan ShawLeadPrimary
ES
Evan ShawLead
Completion

Mark the job complete to trigger handover documentation.

Acceptance certificate
BS 5839-1 Cl. 40.3 / Annex G.4 — required before handover.

Not yet generated.

Available once the job is Complete.

Lifecycle audit
  • Reconstructed from this job's current stage — recorded transitions start from the next change.
  • In ProgressCommissioning
    30 May · Evan Shaw
  • ScheduledIn Progress
    29 May · Evan Shaw
  • CreatedScheduled
    28 May · Evan Shaw
  • —Created
    27 May · Evan Shaw
Notes
  • Control panel positioned; awaiting final containment.
    1 Jun · Evan Shaw
  • Client walkthrough booked for end of week.
    29 May · Evan Shaw
  • Zone plan reviewed against the device schedule.
    26 May · Evan Shaw
Issues & holds

No issues or holds.