Vanguard flagship store

InstallIn Progress

J-2009 · Vanguard Retail Group · Vanguard Flagship Store

Lifecycle
TypeInstall· locked once scheduled
  1. Created
  2. Scheduled
  3. In Progress
  4. Commissioning
  5. Complete
  6. Handed Over
Getting to site
Get directions
Vanguard Flagship Store
200 Market St, Birmingham
B2 4QA
How to get in
Key safe
Access hours
Mon–Fri, 8:00am–5:00pm
Parking
On-site visitor parking
Site contact
James Bloggs
Call site contact
Vanguard flagship store
Design D-307 · 70% complete
Compliant
Device schedule
27 devices
DeviceQty
Optical Smoke13
Visual Alarm Device4
Manual Call Point3
Sounder + VAD5
I/O Interface2
Commissioning checklist
BS 5839-1 Cl. 41 · 0/10 checked
System checks
  • Control panel: mains and standby supply verified
  • Cause & effect matrix verified against design
  • All zones correctly mapped and annunciated
  • Sounder sound pressure level ≥ 65 dB(A) throughout
  • Fault and disablement indication tested
Device checks
  • Optical Smoke — function test (×13)
  • Visual Alarm Device — function test (×4)
  • Manual Call Point — function test (×3)
  • Sounder + VAD — function test (×5)
  • I/O Interface — function test (×2)

James Taylor is not recorded as a competent person, so cannot sign off commissioning. A competent person must sign it.

Defects (0 open)
BS 5839-1 Cl. 44.2 · severity drives the remediation window

No defects raised on this job.

Raise a defect

As-built variations (0)
On-site deviations from the design · JOB-7

No variations — installed as designed.

Material list

No material list (job has no linked quote).

Materials & stock
0 allocation(s)

No stock allocated to this job yet.

Labour & profitability
From approved timesheets
Quoted value
—
Approved labour
£0
Margin (ex-materials)
—
Competent-person attendance

No time logged against this job yet.

Site information
Property
Vanguard Flagship Store
Address
200 Market St, Birmingham
Postcode
B2 4QA
Building type
Retail
Floors
3
System category
BS 5839-6 L2
Floor plans
  • Ground floor· PDF · 22 May
  • First floor· IMAGE · 16 May
View property →
Engineers & dates
DR
Dana ReedLeadPrimary
DR
Dana ReedLead
Completion

Mark the job complete to trigger handover documentation.

Acceptance certificate
BS 5839-1 Cl. 40.3 / Annex G.4 — required before handover.

Not yet generated.

Available once the job is Complete.

Lifecycle audit
  • Reconstructed from this job's current stage — recorded transitions start from the next change.
  • ScheduledIn Progress
    23 May · Dana Reed
  • CreatedScheduled
    22 May · Dana Reed
  • —Created
    21 May · Dana Reed
Notes
  • Zone plan reviewed against the device schedule.
    1 Jun · Dana Reed
  • Commissioning checks scheduled with the duty manager.
    29 May · Dana Reed
Issues & holds

No issues or holds.