Back to jobs

Halcyon lobby detection

InstallCreated

J-2008 · Halcyon Hotels · Halcyon Spa Wing

Lifecycle
Type
  1. Created
  2. Scheduled
  3. In Progress
  4. Commissioning
  5. Complete
  6. Handed Over
Getting to site
Get directions
Halcyon Spa Wing
8 Park Row, Manchester
M2 5LX
How to get in
Key holder on site
Access hours
24/7 — coordinate with the duty manager
Parking
Street parking — pay & display nearby
Site contact
Gemma Hart
Call site contact
Halcyon lobby detection
Design D-306 · 30% complete
2 violations
Device schedule
17 devices
DeviceQty
Optical Smoke8
Heat Detector3
Manual Call Point2
Sounder4
Commissioning checklist
BS 5839-1 Cl. 41 · 0/9 checked
System checks
  • Control panel: mains and standby supply verified
  • Cause & effect matrix verified against design
  • All zones correctly mapped and annunciated
  • Sounder sound pressure level ≥ 65 dB(A) throughout
  • Fault and disablement indication tested
Device checks
  • Optical Smoke — function test (×8)
  • Heat Detector — function test (×3)
  • Manual Call Point — function test (×2)
  • Sounder — function test (×4)

James Taylor is not recorded as a competent person, so cannot sign off commissioning. A competent person must sign it.

Defects (0 open)
BS 5839-1 Cl. 44.2 · severity drives the remediation window

No defects raised on this job.

Raise a defect

As-built variations (0)
On-site deviations from the design · JOB-7

No variations — installed as designed.

Material list

No material list (job has no linked quote).

Materials & stock
0 allocation(s)

No stock allocated to this job yet.

Labour & profitability
From approved timesheets
Quoted value
—
Approved labour
£0
Margin (ex-materials)
—
Competent-person attendance

No time logged against this job yet.

Site information
Property
Halcyon Spa Wing
Address
8 Park Row, Manchester
Postcode
M2 5LX
Building type
Hospitality
Floors
2
System category
BS 5839-6 L2
Floor plans
  • Ground floor· PDF · 22 May
View property →
Engineers & dates
CN
Chris NolanLeadPrimary
Completion

Mark the job complete to trigger handover documentation.

Acceptance certificate
BS 5839-1 Cl. 40.3 / Annex G.4 — required before handover.

Not yet generated.

Available once the job is Complete.

Lifecycle audit
  • Reconstructed from this job's current stage — recorded transitions start from the next change.
  • —Created
    22 May · Chris Nolan
Notes
  • Client walkthrough booked for end of week.
    1 Jun · Chris Nolan
Issues & holds

No issues or holds.