Factory floor L2

InstallIn Progress On hold

J-2004 · Stoneworks Manufacturing · Stoneworks Weighbridge

Lifecycle
TypeInstall· locked once scheduled
  1. Created
  2. Scheduled
  3. In Progress
  4. Commissioning
  5. Complete
  6. Handed Over
Getting to site
Get directions
Stoneworks Weighbridge
Foundry Lane, Derby
DE1 3RU
How to get in
Key safe
Access hours
Mon–Fri, 8:00am–5:00pm
Parking
Street parking — pay & display nearby
Site contact
Sarah Khan
Call site contact
Factory floor L2
Design D-303 · 60% complete
Compliant
Device schedule
26 devices
DeviceQty
Heat Detector9
Beam Detector2
Manual Call Point4
Sounder8
I/O Interface3
Commissioning checklist
BS 5839-1 Cl. 41 · 0/10 checked
System checks
  • Control panel: mains and standby supply verified
  • Cause & effect matrix verified against design
  • All zones correctly mapped and annunciated
  • Sounder sound pressure level ≥ 65 dB(A) throughout
  • Fault and disablement indication tested
Device checks
  • Heat Detector — function test (×9)
  • Beam Detector — function test (×2)
  • Manual Call Point — function test (×4)
  • Sounder — function test (×8)
  • I/O Interface — function test (×3)

James Taylor is not recorded as a competent person, so cannot sign off commissioning. A competent person must sign it.

Defects (0 open)
BS 5839-1 Cl. 44.2 · severity drives the remediation window

No defects raised on this job.

Raise a defect

As-built variations (0)
On-site deviations from the design · JOB-7

No variations — installed as designed.

Material list
ItemQtyUnit £Line £
Hochiki ESP Heat9£30£270
Hochiki FIREbeam Plus2£540£1,080
C-TEC Call Point CP34£22£88
Hochiki Banshee Sounder8£28£224
Apollo I/O Interface Unit3£72£216
Materials & stock
0 allocation(s)

No stock allocated to this job yet.

Labour & profitability
From approved timesheets
Quoted value
£53,600
Approved labour
£0
Margin (ex-materials)
£53,600
Competent-person attendance
  • Dana Reed7hCompetent person
    • 2 Jun · 7h
Site information
Property
Stoneworks Weighbridge
Address
Foundry Lane, Derby
Postcode
DE1 3RU
Building type
Industrial
Floors
1
System category
BS 5839-6 P1
View property →
Engineers & dates
BC
Beth CarterLeadPrimary
Completion

Mark the job complete to trigger handover documentation.

Acceptance certificate
BS 5839-1 Cl. 40.3 / Annex G.4 — required before handover.

Not yet generated.

Available once the job is Complete.

Lifecycle audit
  • Reconstructed from this job's current stage — recorded transitions start from the next change.
  • ScheduledIn Progress
    28 May · Beth Carter
  • CreatedScheduled
    27 May · Beth Carter
  • —Created
    26 May · Beth Carter
Notes
  • Commissioning checks scheduled with the duty manager.
    1 Jun · Beth Carter
  • Initial site survey completed; access arranged with facilities.
    29 May · Beth Carter
  • First-fix cabling underway on the ground floor.
    26 May · Beth Carter
Issues & holds
  • Access blocked — client shutdown until 12th
    Hold · 1 Jun